Home.Earth Nærheden

Home.Earth Nærheden

Energy Consumption Reduction
MWh/year
CO2 reductions
ton/year
Capital Expenditure
€
Savings on operating expenses
€
Payback period
years
AREA
sqm
Fast Facts

Location: Nærheden, Hedehusene, Denmark

Sector: Residential and Commercial (158 homes + 1500 sqm commercial space)

Total floor area: 13.500 sqm

Project type: Turnkey PTES (Energy Pile Thermal Energy Storage) + PVT Solar

Heating delivery: 900 MWh (100% of demand)

Cooling delivery: 200 MWh (100% of demand)

‍

Project Overview

‍Energy Machines ApS has partnered with Home.Earth to provide a turnkey energy solution for their flagship property, Nærheden, in Hedehusene, Denmark. A fully electric integrated energy system will provide Nærheden with 100% renewable heating and cooling derived from the ground, sun, and waste heat generated inside the building. ‍Nærheden, featuring 158 homes and 1,500m² of commercial space, aims to maintain an LCA footprint below 4.7 kg CO2/m²/year -- about 60% lower than the requirement set by Danish Building Regulations. The property is on track to achieve DGNB Gold and Planet certifications.‍

‍The 13,500m² residential and commercial property will rely entirely on a fully electric integrated energy system for heating and cooling. Geothermal energy and waste heat will be stored in concrete foundation piles, known as energy piles, produced by Centrum Pæle A/S. These energy piles will serve as the primary heat source in winter and cooling medium in summer, regulated by Energy Machines™ heat pumps.

‍

Sustainable Features
  • Energy Storage: Surplus heat is stored in the energy piles for later use.
  • PVT Solar Cells: Rooftop PVT solar cells provide additional thermal energy and renewable electricity to power the heat pumps.
  • Low Emissions: The system will operate with nearly zero CO2 emissions, meeting 100% of the property's heating (900 MWh) and cooling (200 MWh) needs without connecting to district energy providers.

‍

‍

Energy piling process, March 2024

‍

Energy piling process, March 2024

Contact about this case

Technologies used

Other Energy Machines